2 spare engines ready for my Z1000`s

  • MFP-Joe
  • MFP-Joe's Avatar Topic Author
  • Offline
  • User
  • User
    Registered
  • forever 18 when on my bike ...!
  • Posts: 585
  • Thanks: 768

2 spare engines ready for my Z1000`s

04 Aug 2026 09:28
#926466
As I mentioned before, I bought two partially disassembled Z1000 engines last year to serve as spares for my Z1000 A1 and A2 models.
One engine, i have completed this february, without any test run. -Was in good measurement,(...both engines were disambled stored about the last 35 years)
At both engines , i`ve equipped them with my refurbished timing-chain gears, nwe rubbers and sliding gear for the timing chain, chains itself been like new!!! Big surprize!

This other, i have cylinder bores lighlly x-honed, / was already in full measurement at the bores.....
Last Friday, a friend and I fitted the pistons—equipped with new rings—into the cylinders (I had already fully overhauled the cylinder heads over the winter: lapped the valves, installed new stem seals, etc.). We mounted the head, finished the rest of the assembly, and then ran the engine on his dyno today.
Everything looks good; the engine runs really well and without any issues!
Now, if the worst happens—say, a major failure mid-season—I can quickly swap in a replacement engine. It’s always a great feeling to have that peace of mind!

Now, they both need a little cosmetic job on the outside of their cases,...Than conserve them and storage...



 
Z1000 A1 1976
Z1000 A2 1977

Greetings, Joe
The following user(s) said Thank You: Mcdroid, Nessism, asphalt900, Wookie58, Kaw-boy 900

Please Log in or Create an account to join the conversation.

  • Mcdroid
  • Mcdroid's Avatar
  • Offline
  • User
  • User
    Registered
  • Gone Kwackers
  • Posts: 6878
  • Thanks: 515

Re: 2 spare engines ready for my Z1000`s

04 Aug 2026 13:26
#926478
Nice having several spare motors. When I purchased my 1977 KZ1000A, it came with a second KZ1000A totally disassembled. I intend on re-assembling the second motorcycle and selling it... 
Michael
Victoria, Texas

1982 GPz750
1977 KZ1000A
1978 KZ1000A
1982 GPz1100
1975 Z2A

The following user(s) said Thank You: MFP-Joe

Please Log in or Create an account to join the conversation.

  • MFP-Joe
  • MFP-Joe's Avatar Topic Author
  • Offline
  • User
  • User
    Registered
  • forever 18 when on my bike ...!
  • Posts: 585
  • Thanks: 768

Re: 2 spare engines ready for my Z1000`s

05 Aug 2026 00:11
#926488
Hello Michael,...but wouldn't it also be nice to potentially have a second Z1000 after the assembly?
 
Z1000 A1 1976
Z1000 A2 1977

Greetings, Joe

Please Log in or Create an account to join the conversation.

  • Kaw-boy 900
  • Kaw-boy 900's Avatar
  • Offline
  • User
  • User
    Registered
  • Let the Good ''Old'' Time Roll !
  • Posts: 124
  • Thanks: 88

Re: 2 spare engines ready for my Z1000`s

06 Aug 2026 14:30
#926520
I remember my first triple 250 at 16 yo when I had to change rings in the middle of summer ! That was the longest week of my life...LOL
Kawasaki and other bike ownend.
S1 250 triple 1973
H1, 500 triple 1975
LTD 1000, 1982
Ninja 1000R 1987
Ninja ZX12R 2006
KZ900 1976. My BB !
Yamaha RD 350 1973
Ducati 1098 2007
Harley Softail 2009 For sale !




The following user(s) said Thank You: MFP-Joe

Please Log in or Create an account to join the conversation.

  • MFP-Joe
  • MFP-Joe's Avatar Topic Author
  • Offline
  • User
  • User
    Registered
  • forever 18 when on my bike ...!
  • Posts: 585
  • Thanks: 768

Re: 2 spare engines ready for my Z1000`s

06 Aug 2026 23:30 - 07 Aug 2026 07:19
#926528
That’s exactly what I mean ;-)
Whenever my scooters aren't working right, are broken, or aren't ready for use, I always feel slightly "paralyzed"... I know that sounds crazy, but that’s just how it is for me... Today, back then—always...


To get back to the history of those two engines:
I managed to buy both of them last summer for very little money; they were both partially disassembled—meaning the cylinders and heads had been removed. I couldn't figure out *why* the cylinders and heads had been taken off; I got the impression the seller simply had an urge to explore or was just purely curious about what the inside of such an engine looked like. In any case! -
Judging by the signs of use, both of these motors look as though they haven't been in operation for long! -Original piston-ring pressure was high, no wear on pistons or cylinderbores, valve shimming between 2,55 to 2,70 !!!
I didn't find any damage at all—quite the opposite: the cylinder bores and pistons were still well within tolerance limits. Neither head showed any of those cracks between the valve seats and spark plug threads that are so common here in Germany,  (.resulting from prolonged driving on motorways at high speeds and high engine speeds) - And both timing chains were still as taut as if they were brand new. The engines had been properly stored—covered and filled with oil—for about 35 years or more...-
.So, the financial outlay for my "parts investment" was very low:
Two sets each of:  New piston rings from "Cruizinimage," , rubber rollers, guide rails, rubber buffers for the timing gear shafts, my refurbished timing sprockets, cylinder head and base gaskets, plus oil and filters...-
The rest was just a straightforward job requiring a bit of elbow grease. The only minor issue was a small chip missing from an outer cooling fin on one of the cylinders; otherwise, there was no visible external damage...
Sometimes, you just get really lucky with a "basket" purchase... I am really happy !!!
Z1000 A1 1976
Z1000 A2 1977

Greetings, Joe
Last edit: 07 Aug 2026 07:19 by MFP-Joe.
The following user(s) said Thank You: Mcdroid, sf4t7, Kelly E, kimchella

Please Log in or Create an account to join the conversation.

Moderators: Street Fighter LTD
Powered by Kunena Forum