KZR's Bikes of the Month for 2024

My Project before I Can Work on Bike Projects

  • bluej58
  • Offline
  • Sustaining Member
  • The chrome don't get you home
More
07 Oct 2019 15:47 #812020 by bluej58
Replied by bluej58 on topic My Project before I Can Work on Bike Projects
I'm starting to get a little jelly

78 KZ1000 A2A

Please Log in or Create an account to join the conversation.

  • Street Fighter LTD
  • Offline
  • Moderator
  • TURBO, Its Better to be Blown than Injected
More
07 Oct 2019 15:51 #812022 by Street Fighter LTD
Replied by Street Fighter LTD on topic My Project before I Can Work on Bike Projects

bluej58 wrote: I'm starting to get a little jelly



If your bike tours bring you near me let me know.
Kaw maintenance or boat rides are always a good thing
Dave.


Original owner 78 1000 LTD
Mr Turbo Race Kit, MTC 1075 Turbo pistons by PitStop Performance , Falicon Ultra Lite Super Crank, APE everything. Les Holt @ PDM's Billet Goodies . Frame by Chuck Kurzawa @ Logghe Chassis . Deep sump 5qt oil pan. RIP Bill Hahn
The following user(s) said Thank You: bluej58

Please Log in or Create an account to join the conversation.

  • bluej58
  • Offline
  • Sustaining Member
  • The chrome don't get you home
More
07 Oct 2019 16:15 #812029 by bluej58
Replied by bluej58 on topic My Project before I Can Work on Bike Projects
We are planning a Lake Michigan loop for next year, maybe we can stretch the route a bit :)

78 KZ1000 A2A
The following user(s) said Thank You: Street Fighter LTD

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
08 Oct 2019 15:07 - 08 Oct 2019 15:15 #812080 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
Today my foundation guy did the following:
Cut out the gas curb to make one continous floor with pre existing . He leveled the substrate, put plastic down and then steel mesh. Tomorrow is the floor pour!


Here is the exterior with the shingles on roof.
Also used some of the left over soil spoils to level a low spot in the yard.


This shed was in the location where the addition is going in. Did not want to give up the storage space of this 10' x 10' shed. Moved it out into my yard.



Hey Jack, how about Peanut Butter Jelly Time!
BTW, have gone around Lake Michigan with Lawrence. It was quite an adventure!

KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Attachments:
Last edit: 08 Oct 2019 15:15 by Forrest.

Please Log in or Create an account to join the conversation.

  • bluej58
  • Offline
  • Sustaining Member
  • The chrome don't get you home
More
09 Oct 2019 05:38 #812115 by bluej58
Replied by bluej58 on topic My Project before I Can Work on Bike Projects
I saw that big pile of siding, you should have plenty to do your project, great color match on the shingles too.
You should be wrapped up in no time. then the fun starts!

78 KZ1000 A2A
The following user(s) said Thank You: Forrest

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
09 Oct 2019 14:56 - 09 Oct 2019 16:09 #812140 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
Yup, re using as much siding as possible. More siding needed, believe it or not! Carpenter is going to finish when he comes back for the soffit, gutter, drop down ladder etc.. He has ordered more siding. It will go where the color match is least noticeable.... hopefully. Foundation guy did put in rebar as well as mesh for the floor. Building inspector did his thing and approved the main floor area but forgot to have a concrete pad put in for the side door. Village requires a proportionate concrete pad consisting of 4-6" of stone with 4" of concrete. This for just a 36" X 36" door pad. Foundation may not get poured until next week. I am asking for this week. I want to coat the new and existing garage floor before moving everything in. The concrete needs to cure for 30 days according to the coating guy. I sure hope I can get my equipment and bikes in before the snow flies! :pinch: :whistle:

KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Last edit: 09 Oct 2019 16:09 by Forrest.

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
15 Oct 2019 09:51 #812493 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
Floor poured and smoothed yesterday.



Side door pad poured withe light texture for grip.


Next up is the electrician to install sub panel and rough in electrical lines & outlets. Maybe tomorrow or Thursday.

KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Attachments:
The following user(s) said Thank You: Street Fighter LTD

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
18 Oct 2019 16:09 - 18 Oct 2019 16:10 #812691 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
Picked up my back ordered window today Got a lock set for my door. AND, bought one of those electric reel outlets that I will position over the bike lift area. The electrician will be out to mark up the rough-in for the outlets, lighting and such on Monday a.m.. Once the electrical lines and outlets are in place on Tuesday I will have the building inspector do his thing. After that, the carpenter is back to put on old and new siding back along with installing the door and window. One day at a time and sometimes two, three days or even a week before anything else happens! :whistle: :whistle:

KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Last edit: 18 Oct 2019 16:10 by Forrest.
The following user(s) said Thank You: Street Fighter LTD

Please Log in or Create an account to join the conversation.

  • bluej58
  • Offline
  • Sustaining Member
  • The chrome don't get you home
More
19 Oct 2019 06:55 - 19 Oct 2019 06:56 #812708 by bluej58
Replied by bluej58 on topic My Project before I Can Work on Bike Projects
Almost dried-in, that's great, your carpenter may need to dodge some rain this week.
If your electrician can ruff the outside light and outlet by the side door your carps can get rolling.
We're wrapping up installing new gutters on our place today, I'll be glad when that's over.
Tomorrow we ride!

78 KZ1000 A2A
Last edit: 19 Oct 2019 06:56 by bluej58.

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
26 Oct 2019 07:11 - 26 Oct 2019 18:16 #813052 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
This week the electrician roughed-in the electrical. A buddy and I had to put the fire rated drywall up on the common wall to the house. Needed to do this due to electric lines and outlets need to be surface mounted. The other two walls and ceiling will be recessed electric lines and went in before drywall. Notice the box on the wall? That is a subpanel with dedicated 20 amp breakers. Also, had an outlet wired for 240 volt. Will run the air compressor on that one.



Electrician missed running conduit and outlet for gas heater. It will be suspended in upper left corner. They will be back before drywall. Ceiling will be getting three 8' light fixtures. Also, got outlet roughed-in for outlet in ceiling for drop down power reel. Plenty of counter height and floor power outlets. Carpenter is behind schedule. Drywall contractor bids next week!


KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Attachments:
Last edit: 26 Oct 2019 18:16 by Forrest. Reason: Added info

Please Log in or Create an account to join the conversation.

More
01 Nov 2019 11:40 #813387 by Skidmark
Replied by Skidmark on topic My Project before I Can Work on Bike Projects
Nice work on the addition! I didn't have a building to modify, or add on to. So I ended up hiring a contractor to build my shop for me.


Retired gearhead
'81 KZ-750 E2
'87 Suzuki Savage 650 Street Tracker (lost in the shop fire)
Attachments:

Please Log in or Create an account to join the conversation.

  • Forrest
  • Topic Author
  • Offline
  • Sustaining Member
  • The Mad Duck
More
01 Nov 2019 16:02 - 01 Nov 2019 16:02 #813403 by Forrest
Replied by Forrest on topic My Project before I Can Work on Bike Projects
That is the way to go Skidmark! One day I will build a new house and have a separate building like yours. Thinking about a tunnel from house to said garage...:evil:

Update: Carpenter back today after rain, snow, and generally just the worst weather for the end of October one could imagine. It was 18 degrees Fahrenheit this morning. The sun was out and warmed to maybe 40. So, making progress. Next week the siding work will be finished. Will be tacking in insulation myself this weekend. The electrician will rough in one more outlet for gas heater. The dry wall will be hung on Wednesday. Friday, looking forward to a dryer duct flue and the gas heater getting installed by HVAC contractor. After that the dry wall taping. Will likely paint the walls and ceiling myself. Then the floor will be coated floor! After all that I will be moving in my equipment and then bikes! :woohoo: More pictures to come....

KZ RIDER RELAY FLAG CARRIER #55
1977 KZ650B Ready & Fit to Roll Anywhere!
1974 F7 175 -first bike and still own, full resto soon!
2002 ZRX1200R -Red the faster color
2011 Concours 14 -Now a Snarling Wolf in Sheep's Clothing!

Last edit: 01 Nov 2019 16:02 by Forrest.

Please Log in or Create an account to join the conversation.

Powered by Kunena Forum

If you like KZR Please consider making a donation. Thank you.

KZRider is free, but not without cost.

Please consider chipping in a few bucks to help cover the cost of running the KZR servers.